Specifications name |
major dispositions |
Unit (set) |
55-1100吹膜机 55-1100 film blower |
直径 55mm 螺杆; 11KW6 级主机马达 (江晟); 配红线机; 配12寸模具; 打骨机另外计价; 米克重装置另外计价 自动张力控制系统另 外计价; 火花机另外计价
55mm diameter screw; 11KW6, class main engine motor (Jiang Sheng); With red line machine; With a 12-inch mold; Bone-beating machine additional pricing; Mike heavy device additional pricing, automatic tension control system additional pricing; Spark machine additional pricing |
1 |
米克重 Mick heavy |
1 |
|
自动张力 Automatic tension |
1 |
|
打骨机 Bone machine |
2 |
|
火花机 Spark machine
|
1 |
|
火花机架 Spark rack |
1 |
Specifications name |
major dispositions |
Unit (set) |
800*2680切袋机 800 * 2680 bag-cutting machine |
800*2680进口硅胶输送带 迈信伺服控制 1 套 0.75KW 欧瑞变频器 2 台 1.5KW 欧瑞变频器 1 台 1.1KW 江晟刹车电机 1 台 德国进口电眼 370KW 江晟三相电机 2 台 永宏 PLC 控制器 维纶触屏控制器
800 * 2680 imported silicone conveyor belt Main servo control 1 set 0.75KW frequency converter 21.5KW, 1 frequency converter 1.1KW Jiangsheng brake motor, 1 electric eye imported from Germany 370KW Jiangsheng three-phase motor 2 Yonghong PLC, controller Verylon touchscreen controller |
1 |
FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 40 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l Specifications and functions of the machine match the content of this contract.
l Electrical, mechanical and control systems run smoothly.
l Run out sample products as required.
l Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
6.1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
6.2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
6.3 The buyer pays the seller under Article 4 of this contract.
6.4 The expenses such as as airplane, visa, travel expenses,other expenses for foreign engineers in china will be paid by the Seller.
6.5 The Other expenses such as pick up and see off ,dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 150USD each day .
ARTICLE 5: SELLER'S LIABILITY
7.1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
7.2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.