OG-系列快递袋吹膜机配置一览表
型号 |
OG-2G55-1200 |
|
主机部分Main part |
主电机 main motor |
22KW*2(变频控制)inverter control |
齿轮箱 gear box |
173*2(国标)high-strength hard tooth surface |
|
螺杆料筒 screw and barrew |
55*2 30:1 |
|
螺杆材料 screw matirial |
38铬钼铝氮化处理 38Chromium molybdenum aluminum nitrogen treatment |
|
三通 T- Die |
180 |
|
模头die |
250 LDPE |
|
模头材质 matirial of die |
45#碳钢 45#carbon steel |
|
风环 air ring |
780 |
|
风机 blower |
5.5KW |
|
气泵 air compressor |
没有 no |
|
螺杆冷却风机 cool fan |
4pc |
|
加热圈 heating |
不锈钢stainless steel |
|
最大挤出量 capacity |
100 kg/h |
|
吹膜折径 width of film |
800-1200mm |
|
薄膜单层厚度 thickness of single- face film |
0.01-0.1mm |
|
旋转模头 rotary die |
有 yes |
|
快速换网 high speed net change |
选配 OPTIONAL |
|
牵引架Traction frame |
牵引辊宽度 width of traction roller |
1300mm |
牵引皮辊直径 diameter of traction roller |
150mm |
|
牵引电机 traction motor |
1.5KW蜗轮电机变频控制worm gear motor inverter control |
|
人字板 Letter“A”board |
A字型木条式wooden |
|
压紧方式 Pressing method |
汽动 cylinder control |
|
压花、插边 emboss gusset |
选配 OPTIONAL |
|
定型圈 bubble setting |
鼠笼式squirrel-cage |
|
牵引架是否升降 up and down |
没有 no |
|
收卷 rewinder |
收卷皮辊长度Rewinder roller length |
1300mm |
收卷皮辊直径diameter of rewinder roller |
250mm |
|
独立单收卷rewinder |
双收卷double rewinde |
|
力矩电机Torque motor |
10N.M |
|
力矩表Torque meter |
20A |
|
收卷辊Rewinder roller |
4条(镀白铁辊)normal |
|
机器总高 hight |
6.0m |
|
电柜 Electric box |
变频器invertor |
易能 ENC |
低压电器Low voltage electrical equipment |
正泰 Chint |
|
温度表Temperature controller |
亚泰 yatai (aiset) |
|
电流表ammeter |
国产Made in china |
|
电压表voltmeter |
国产Made in china |
|
总功率 Total Power |
50kw |
|
电压 voltage |
3相380v 50HZ 3 phase 380V 50HZ |
|
价格price |
FOB CHINA |
27000 USD
|
FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 50 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l Specifications and functions of the machine match the content of this contract.
l Electrical, mechanical and control systems run smoothly.
l Run out sample products as required.
l Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)