OG-HD55 Single Screw 900 LDPE Film Blowing Machine
OG-HD55 单螺杆900 型LD PE吹膜机
OG-HD55 Single Screw 900 LDPE Film Blowing Machine
Type 类型 |
OG-HD55 单螺杆900 型LD PE吹膜机 |
|
Cavity 产量 |
40-60 kg/h |
|
|
||
Main part 主要部分 |
main motor 主电机 |
18.5kw China brand 18.5kw 中国品牌 |
gear box 变速箱 |
173*1 hard tooth surface 173*1硬齿面 |
|
screw and barrew 螺旋桨 |
∅ 55MM |
|
Die exchange |
Ф180mm die exchange 180毫米交换器 |
|
|
||
air ring 空气环 |
900mmLDPE double air ring 900mm 低密度聚乙烯双 空气圈 |
|
Blower 风机 |
3.5 KW inverter control 3.5千瓦逆变器控制 |
|
|
||
cool fan 冷风机 |
3 *250W 3 * 250W |
|
|
||
Heating 暖气 |
Stee l钢铁 |
|
capacity(by material and size) 容量(按材料和尺寸) |
≈100kg/h |
|
width of film 胶片的宽度 |
≤800 mm |
|
thickness of single- face film 单面薄膜厚度 |
0.01-0. 1mm |
|
Traction frame 牵引车 架 |
width of traction roller 牵引辊宽度 |
900mm |
traction motor 牵引电动机 |
1.5KW worm gear motor inverter control 1.5 KW 蜗轮蜗杆马达逆变器控制 |
|
Letter“A ”board 字母 A 板 |
Wooden 木头的 |
|
|
||
Pressing method 按压法 |
cylinder control 按压法 |
|
Automatic film width control 自动胶片宽度控制 |
1 set 一套 |
|
bubble setting 气泡设置 |
squirrel-cage 松鼠笼 |
|
Rewinder 复卷机 |
Rewinder roller length 复卷机卷筒长度 |
900mm |
Single wider |
By hand change film roller 手动换膜辊 |
|
Air shaft 通风井 |
2 pcs 2个 |
|
Rewinder banana roller 复卷机香蕉滚筒 |
Have 有 |
1) Screw Diameter: 55mm*1set ; L/D Ratio: 30:1
螺杆直径:55mm *1套,长径比: 30:1
2) Bimetallic Separating, Barrier And Mixing
双金属分离、阻隔及混合
3) Material: 38 Crmoa1A,
物料: 38Crmoa1A,
4) Heating Treatment: Forging, Heat Treatment And Nitrified;
热处理: 锻造,热处理和硝化
5) Barrel:Material: 38 Crmoa1A,
桶: 材质: 38Crmoa1A,
6) .Heating Treatment: Forging, Heat Treatment And Inner Hole Nitrified
热处理: 锻造,热处理和内孔渗氮
7) Max. Screw Rotating Speed: 100r/Min
螺杆转速:
100r/Min
8) Forced Water Chilling For Feed Section Of Barrel, Adopted aluminum Heater With Inner
Cooling Structure For Transmission, Measure And Mixing Sections.
筒体进料段强制水冷,传动、测量、混合段采用内冷结构铝加热器。
9) Barrel Heating 4 Zones ,4 Zones
桶式加热4区,4区
10) Barrel Cooling Blower:250Wx2
桶式冷却风机:250Wx2
Gear Box, china SG brand:(2 Sets)
齿轮箱,中国 SG 品牌: (2套)
1. Gear type: standard involute cylindrical skew wheel
齿轮类型: 标准渐开线圆柱斜齿轮
2. Material for gear: 20CrMnTi, through high frequency quenched treated and precise grinding. 齿轮材料: 20CrMnTi ,经高频淬火处理,精密磨削。
3. Lubrication wary: forced all cycle lubrication
润滑警惕: 强制所有循环润滑
4. Cooling way: force water cycle cooling for oil temperature
冷却方式: 油温强制水循环冷却
5. Oil filtering way: disassemble outside oil filter with cooler
滤油方式: 用冷却器将滤油器外部拆卸
6. Extruder main motor 18.5KW; Chinese brand
挤出机主马达18.5KW; 中国品牌
7. Kovo, inverter control
科沃变频器控制
8. Motor direct connection mode
电机直接连接方式
LDPE Die head 1 set:
LDPE模头1套:
HDPE Die head 1 set
HDPE模头1套:
Diameter: φ120mm exchange lip
直径: φ180mm 交换唇
1) Introduced advanced technology from Germany,use imported German TC2.8K four-axis simultaneous machining center to produce spiral die.The die will be with features of high precision,good finish and no deformation.
引进德国先进技术,采用进口德国 TC2.8 K 四轴联动加工中心生产螺旋模。该模具具有精
度高、光洁度好、不变形等特点。
2) Die Material: All made of 40Cr alloy steel.Through forging, heat treatment , processed in 5
axis machining center ,then applying advanced polishing technology to make the dies surface as
smooth as mirror. To ensure the flow channel evenly distribute materials and make sure that there is no stagnation area in the products, dies are further processed by non-electrolytic nickel plating, wear
resistance and corrosion resistance of the dies are also enhanced.
模具材料: 全部采用40Cr合金钢制造。通过锻造、热处理,在5轴加工中心进行加工,然后采用 先进的抛光技术,使模具表面光滑如镜。为保证流道内物料均匀分布,保证产品无滞留区,模具 进一步采用非电镀镍处理,提高了模具的耐磨性和耐腐蚀性。
3) Heater: steel heater ,
加热器: 钢加热器,
4) Air ring :cast aluminium
5)空气环: 铸铝
6) Air ring construction: two-tier structure Air outlet
风圈结构: 双层结构风口
Machine take up机器占用率::
1) Traction roller width : 900mm, maximum Valid film lay ring flat width: 800mm 牵引辊宽度: 900毫米,最大有效薄膜铺设环平面宽度: 800毫米
2) Traction Frame: two layer, square integrated structure
牵引架: 两层,方形整体结构
3) Motor of Upper Traction: 1.1KW ,inverter control.
上牵引电机: 1.1 KW ,逆变器控制。
4) V-shaped Device: Adopts wooden
V 型机构: 采用木制
Machine winder unit机械卷绕装置 :
1. the width of coiling roller is 900mm
卷取辊宽度为900mm
2. single side winder
单面卷绕机
3. Winding mode: surface friction winder ,controlled by inverter
绕组方式: 表面摩擦式绕组,由变频器控制
4. Cutting film and change the roller by hand;
手工切割薄膜和更换滚筒;
5. the winder control by torque motor tension controll
卷绕机的控制由力矩电机张力控制
6. Winding motor power:20NM
绕组电机功率: 20NM
7. Max. Coiling film width:800mm
最大卷膜宽度: 800毫米
8. Max. Diameter: 800mm
最大直径: 800毫米
9. Max. winding speed: 60m/min
最大卷绕速度: 每分钟40-60米
10. Winder shaft: 3 inch x 2 pieces
卷绕轴: 3英寸x 2片
11. Meter counter with alarm
带警报的仪表计数器
12. Bowed roll
保龄球
1. The inverter adopts the brand of Kovo
变频器采用科沃品牌
2. The contact and relay and switch adopt the CHINT brand
触头、继电器、开关采用 CHINT 品牌
3. The temp.controller adopt the CHINA brand
临时主管采用 CHINA 品牌
4. The SSR choose the CHINT brand
战略科学军团选择 CHINT 品牌
5. the power :three phase ,four wire 380V 50Hz
功率: 三相四线380V 50Hz
6. The total power About 35KW , standard working use about 10-15KW
总功率约45KW ,标准工作用电约25W
FOB Guang Dong China.
- Delivery time: The Seller will hand over the goods to the buyer after 60 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l ü Specifications and functions of the machine match the content of this contract.
l ü Electrical, mechanical and control systems run smoothly.
l ü Run out sample products as required.
l ü Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
3 The buyer pays the seller under Article 4 of this contract.
4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.
5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 200USD each day .
ARTICLE 5: SELLER'S LIABILITY
1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.