Quotation
OG-FQ500单层冰袋
OG-FQ500 ice bag making machine
型号 Model |
OG-FQ500单层冰袋 OG-FQ500 ice bag making machine |
||
机型图片 Mold Picture |
适合HDPE. LDPE 筒膜 Specialize to make HDPE,LDPE tube film |
||
价格 Price
|
型号 Model |
OG-FQ500 |
8000 USD/set |
模具 mould |
3000 USD/set |
主要配置 Main Configuration
序号NO. |
名称 Name |
配置明细 Configuration details |
1 |
主机系统 main system |
1.5KW 4P 电机、台湾台达变频调速 AC motor with Taiwan frequency converter control speed |
2 |
前送牵引系统 traction system |
配1KW伺服电机及驱动器、2015液晶智能电脑控制器 1kw servo motor & Panasonic AC driver, 2015ALCD computer controller |
3 |
后送系统 feeding system |
300w电机、摆架控制 DC motor with f control speed |
4 |
切刀 Cutting knife |
采用国内知名品牌嘉龙刀具 China brand JIALONG |
5 |
控温系统 Temperature controlling |
配上海亚泰智能控温表 Thermocouple & Automatic Digital Shanghai |
6 |
模具材料 Mould material |
采用优质合金铝雕刻(待定) Use aluminium alloy |
7 |
上料系统 Feeding Unit |
采用气胀轴自动上料。磁粉张力控制 Use sir shaft auto feeding magnetic powder tension control |
8 |
胶辊材料 Roller material |
采用PU材质,气缸调节 Use PU material cylinder adjustment |
9 |
主要轴承 Main Bearing |
采用日本NTN品牌 Use Japan brand NTN |
10 |
Passing part 过料平台 |
采用优质不锈钢板 Stainless steel |
11 |
静电消除 electrostatic eliminating |
采用强力静电消除套装 Use strong power electrostatic eliminator |
12 |
机架 Holder |
采用优质铸铁支架固定,稳固耐用 cast iron bracket , stably |
13 |
放料架 Stander |
采用张力控制 Use tension control |
技术参数 Technical Parameter
Specification |
Model |
OG-FQ500 |
|
制袋宽度Max.Width of bag making(mm) |
450 |
制袋长度Max.Length of bag making(mm) |
55-500 |
制袋速度Machine speed(pcs/min) |
30-140 |
制袋厚度thickness of film(mm) |
0.02-0.20 |
制袋误差Tolerance(mm) |
±1mm |
整机功率Power Required(kw) |
3.2KW |
设备尺寸Machine size(mm) |
3800*1000*1450 |
机器重量Machine N.W(KGS) |
850kg |
随机配件 Spare part
NO. |
名称Name |
数量Amount |
1 |
前送弹簧350MM feeding spring |
50pcs |
2 |
热电偶thermocouple |
2pcs |
3 |
继电器relay |
2pcs |
4 |
耐热布heat-resisting fabric |
2M |
5 |
加热片heater |
4pcs |
6 |
工具 tool |
1set |
7 |
工具箱tool box |
1pcs |
8 |
切刀cutter |
1pcs |
FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 30 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l ü Specifications and functions of the machine match the content of this contract.
l ü Electrical, mechanical and control systems run smoothly.
l ü Run out sample products as required.
l ü Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES).
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
3 The buyer pays the seller under Article 4 of this contract.
4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.
5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 200USD each day .
ARTICLE 5: SELLER'S LIABILITY
1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.