blowing film machine
OG-系列吹膜机配置一览表
型号 |
OG-ABA1200 |
|
主机部分Main part |
主电机 main motor |
22KW*1/30K* 1 inverter control |
齿轮箱 gear box |
180*1/ 200*1 国标硬齿面 high-strength hard tooth surface |
|
螺杆料筒 screw and barrew |
60*1 30:1 65*1 30:1 |
|
螺杆材料 screw matirial |
38铬钼铝氮化处理 38Chromiu Wm molybdenum aluminum nitrogen treatment |
|
三通 T- Die |
200 |
|
模头die |
280 LDPE |
|
模头材质 matirial of die |
40铬 40chrome |
|
风环 air ring |
双风口风环 DOUBLE AIR RING |
|
风机 blower |
5.5KW inverter control |
|
气泵 air compressor |
没有 no |
|
螺杆冷却风机 cool fan |
4pc |
|
加热圈 heating |
不锈钢 stainless steel |
|
最大挤出量 capacity |
100 kg/h |
|
最大吹膜折径 max width of film |
1200mm |
|
薄膜单层厚度 thickness of single- face film |
0.01-0.15mm |
|
旋转模头 rotary die |
有 yes |
|
快速换网 high speed net change |
选配 OPTIONAL |
|
牵引架Traction frame |
牵引辊宽度 width of traction roller |
1400mm |
牵引皮辊直径 diameter of traction roller |
150mm |
|
牵引电机 traction motor |
1.5KW蜗轮电机变频控制worm gear motor inverter control |
|
人字板 Letter“A”board |
A字型木条式wooden |
|
压紧方式 Pressing method |
汽动cylinder control |
|
压花、插边 emboss gusset |
选配 OPTIONAL |
|
定型圈 bubble setting |
鼠笼式squirrel-cage |
|
牵引架是否升降 up and down |
选配 OPTIONAL |
|
收卷 rewinder |
收卷皮辊长度Rewinder roller length |
1400mm |
收卷皮辊直径diameter of rewinder roller |
250mm |
|
收卷rewinder |
单收卷 single rewinde |
|
电机 motor |
10n.m |
|
剖刀 film side open |
单边剖 one side |
|
收卷辊Rewinder roller |
2条(气涨轴)air shaft |
|
机器总高 hight |
5.8m |
|
电柜 Electric box |
Switch 开关 |
Schneider,France施耐德 |
Temperture meter温控表 |
Yatai,China 亚泰 |
|
Relay继电器 |
Omron,Japan or Schneider,France欧姆龙或施耐德 |
|
potentioameter电位器 |
Bourns,USA伯恩斯 |
|
AC contactor 交流接触器 |
Chint,China正泰 |
|
Low Voltage Electrics 低压电器 |
Chint,China正泰 |
|
Breaker断路器 |
Chint,China正泰 |
|
Inverter 变频器 |
国产 china brand |
|
Control box colling fan 排风 |
2pcs,China国产 |
|
总功率 Total Power |
100kw |
|
电压 voltage |
3相380v 50HZ 3 phase 380V 50HZ |
|
价格price |
FOB |
35000 USD |
选配价格 |
快速换网 high speed net change |
2000USD |
升降If the Traction frame need up and down |
+500USD
|
|
双收卷If need double winder |
+3000USD
|
|
压花 emboss roller |
+200USD |
|
插边 gusset |
+200USD |
FOB China.
- Delivery time: The Seller will hand over the goods to the buyer after 45 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment,from the day confirm the sample draw(if have)
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l Specifications and functions of the machine match the content of this contract.
l Electrical, mechanical and control systems run smoothly.
l Run out sample products as required.
l Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
3 The buyer pays the seller under Article 4 of this contract.
4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.
5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 100USD each day .
ARTICLE 5: SELLER'S LIABILITY
1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.