Additional subservience equipment:
NO. |
Name |
Spec |
Model |
Unit Price USD |
2.3.1 |
Autoloader |
300 Kg/hr |
XC-X800G |
500 |
2.3.3 |
Water Chiller |
12725Kcal/hr |
OG-5HP |
1400 |
2.3.4 |
Crusher |
400Kg/hr |
XC-GP400 |
1700 |
2.3.5 |
Mixer |
100kg |
XC-HL100KG |
900 |
Mixer
model |
XC- HL50KG |
XC-HL100KG |
XC- HL200KG |
(Extemal size) |
845*840*1060 |
1250*1170*1430 |
1250*1170*1430 |
(Capacity) |
50kg |
100KG |
200KG |
( Power) |
1.5kw |
3KW |
7.5KW |
( weight ) |
125kg |
150KG |
313KG |
Auto loader
MODEL |
XC-X300G |
XC-X400G |
XC- X700G |
XC- X800G |
Extemal size(mm) |
300x400x500 |
300x400x500 |
580x300x550 |
580x300x550 |
Capacity |
300-400kg |
300-400kg |
300-400kg |
300-400kg |
Power |
1.1kw |
1.1kw |
1.1kw |
1.5kw |
volume of hopper |
6L |
6L |
6L |
6L |
weight |
15kg |
20KG |
25KG |
25kg |
Crusher
Model |
XC-GP230 |
XC-GP300 |
XC-GP400 |
XC-GP500 |
XC-GP600 |
|
XC-GD230 |
XC-GD300 |
400*300 |
XC-GD500 |
XC-GD600 |
||
crushing chamber (mm) |
230*200 |
310*200 |
200-400 |
410*240 |
610*330 |
|
capacity (kg/h) |
100-150 |
150-200 |
2 |
200-250 |
350*450 |
|
stationary cutter |
2 |
2 |
2 |
2 |
4 |
|
rotary cutter |
6 |
9 |
12 |
12 |
20 |
|
power |
Kw |
4 |
5.5 |
7.5 |
11 |
15 |
HP |
5 |
7.5 |
10 |
15 |
20 |
|
dimension (L×W ×H cm) |
89*64*114.5 |
101*81.5*133 |
1090*870*1340 |
103*84*139 |
129*107.5*174 |
|
NW(kg) |
400 |
435 |
540 |
604 |
1180 |
AIR COOL WATER CHILLER
MODEL |
OG-3HP |
OG-5HP |
OG-10HP |
OG-15HP |
Cooling capacity (Kacl/h) |
6803 |
12725 |
24940 |
63726 |
power(kw) |
2.2 |
3.75 |
7.5 |
18 |
/Refrigerant |
R22 |
R22 |
R22 |
R22 |
pump power(kw) |
0.75 |
0.75 |
1.5 |
4 |
Water tank capa (L) |
30 |
50 |
110 |
210 |
Weight (Kg) |
165 |
190 |
360 |
500 |
Attachment 1(附表一)
The technical specifications of OG-SERIES Automatic Extrusion Plastic Blow Molding Machine
OG系列 - 自动挤出吹塑机 - 主要技术参数
型号 MODEL |
OG-D2L-75Ⅱ |
|
制品最大容量 MAX.CAPACITY OF PRODUCTION |
L |
2.0 |
模头数量(个) DIE HEAD QUANTITY |
PCS |
2 |
中间距离 CENTRAL DISTANCE |
MM |
160 |
工位数量(个) WORK STATION QUANTITY |
PCS |
2 |
螺杆直径 SCREW DLAMETER |
MM |
Φ75 |
SCREW LENGTH/DLAMETER RATIO |
L/D |
25/1 |
螺杆转速 SCREW ROTATION RATE |
R/MIN |
~75 |
挤出量 EXTRUDING VOLUME |
KG/HR |
~80 |
锁模力 MOLD CLAMPING FORCE |
KN |
80 |
模板尺寸(宽×高) MOLD PLATE DIMENSIONS (W×H) |
MM |
470×450 |
配用模具厚度 MOLD THICKNESS |
MM |
-250 |
开模行程 OPENING-MOLD STROKE |
MM |
350 |
主电机功率 MOTOR POWER |
KW |
30 |
总功率 GENERAL ASSEMBLY POWER |
KW |
48 |
正常运行耗用功率 NORMAL POWER CONSUMPTION |
% |
50~70 |
气源压力 AIR SUPPLY PRESSURE |
MPA |
0.5~0.7 |
APPEARANCE(L×W×H) |
MM |
3200×2300×2500 |
机器重量 WEIGHT |
KG |
5600 |
Note: Due to continuous improvement, data above is only for reference, such as subject to change without a separate notice. |
Attachment 2(附表二)
The main configuration of OG-SERIES Automatic Extrusion Plastic Blow Molding Machine
OG系列 - 自动挤出吹塑机 - 主要配置
A. 主机部分 HOST PART |
|
1. 料筒螺杆 SCREW BARREL 2. 主电机MAIN MOTOR 3. 减速机SPEED REDUCER 4. 变频器INVERTER |
中国优质38CrMoALA氮化 HIGH QUALITY 38CrMoALA NITRIDING, CHINA 中国CHINA 中国CHINA 台湾“台达”“DELTA”, TAIWAN |
B. 电器控制部分 ELECTRIC CONTROL SYSTEM |
|
1. PLC可编程控制器PLC PROGRAMMABLE CONTROLLER 2. 触摸屏TOUCH PANEL 3. 固态继电器SOLID STATE RELAY 4. 温控模块 TEMPERATURE CONTROLLER 5. 中间继电器INTERMEDIATE RELAY 6. 接近开关PROXIMITY SWITCHES 7. 伺服控制器 SERVO CONTROLLER |
台湾“威纶通”“WEINVIEW”, TAIWAN 台湾“ΛNV”“ΛNV”, TAIWAN 韩国“奥托尼克斯” “Autonics”, KOREA 美国“霍尼韦尔”“HONEYWELL”, USA 韩国“奥托尼克斯”“Autonics”, KOREA 台湾“台达”“DELTA”, TAIWAN /中国“汇川” “INOVANCE”, CHINA |
1. 电磁换向阀SOLENOID VALVE |
日本“SMC”/ “SMC”, JAPAN |
1. 电磁阀SOLENOID VALVE 2. 伺服油泵SERVO PUMP |
日本“住友” “SUMITOMO”, JAPAN |
OPTION
E. 100型坯壁厚伺服控制系统100 PARISON SERVO CONTROL SYSTEM |
|
1. 液压油箱HYDRAULIC OIL TANK 2. 伺服阀SERVO VALVE 3. 高压过滤器HIGH VOLTAGE FILTER 4. 传感器SENSOR 5. 油泵电机PUMP MOTOR 6. 液压油泵HYDRAULIC PUMP 7. 100点伺服控制器 100-POINT SERVO CONTROLLER 8. 伺服油缸SERVO OIL CYLINDER |
采用不锈钢制造MADE OF STAINLESS STEEL 意大利“阿托斯”“ATOS”, ITALY 中国“黎明”“LIMING”, CHINA 意大利“杰弗伦”“GEFRAN”, ITALY 台湾“群策” “CHYUN TSEH”, TAIWAN 日本“油研”“YUKEN”, JAPAN 中国 CHINA 中国“伟力”“WALEY”, CHINA |
FOB Guang Dong China.
- Delivery time: The Seller will hand over the goods to the buyer after 60 business days, excluding Saturdays, Sundays and public holidays (1-5 days for ship departure and customs clearance) Both parties sign the contract and the seller receives the full payment
- Place of delivery: at the buyer's address, the buyer will receive the goods and put in place to install
Set up :
- The Seller completes the installation of the equipment for the buyer within one week from the date the equipment is returned to the buyer's location.
Acceptance :
l Equipment that is considered valid must meet the following requirements:
l Specifications and functions of the machine match the content of this contract.
l Electrical, mechanical and control systems run smoothly.
l Run out sample products as required.
l Must have a certificate of quality of the place of production and documents attached to the machine.
ARTICLE 2: PAYMENT METHOD
v The buyer makes payment to the seller in 02 times by transfer to the seller's account.
v First time: The buyer advances to the seller 30% of the contract value, right after the two parties sign the contract.
v 2nd time: The buyer pays the seller 70% of the contract value, immediately after the seller sends the video of the acceptance of the camera and the picture, sends the standard sample to the buyer (IF YES). The seller will send a notice of delivery to the buyer.
ARTICLE 3: WARRANTY
Warranty period: within 12 months from the acceptance date of the equipment.
During the warranty period, if the equipment is defective by the manufacturer of the Seller, the Seller is responsible for the presence at the purchaser factory within 48 hours of being notified to repair the equipment. All costs incurred will be borne by the Seller.
(If the device is faulty by the user or is affected by unintended issues such as
Unstable electrical lines, collisions, natural disasters, unclean hygiene, the purchaser must be fully responsible for paying for repair and other replacement expenses)
ARTICLE 4: BUYER'S LIABILITY
1 Provide auxiliary systems and handover surface installation equipment. The auxiliary systems include: supply of supplies and preparation of 3 Phase 220V / 50Hz power supply systems for electrical appliances including switches, sockets, power wires, Electric three-phase electric switches, electric lines, steam-lines, gas lines, gas valves, pipes, elbows,
The buyer is responsible for dropping the item at the buyer's address to the correct location
2 The purchaser shall be responsible for sending the representative to receive the goods and taking over the test when the equipment has been installed and the instruction manual is used.
3 The buyer pays the seller under Article 4 of this contract.
4 The expenses such as other expenses for foreign engineers in china will be paid by the Seller.
5 The Other expenses such as airplane, visa, travel expenses and dining, hotel for technical will be charged by the buyer,the buyer will be pay for the engineer 200USD each day .
ARTICLE 5: SELLER'S LIABILITY
1 Commitment to deliver the equipment to the purchaser in accordance with the type and design of this contract.
2 Vendors undertake:
Asian. Ensure time and progress of equipment handover
B. Assurance of quality and content in accordance with agreement requirements.
C. Vendors nominate technical staff to assist, install and guide the buyer to operate and use the equipment well when installing the machine.